<|ref|>sub_title<|/ref|><|det|>[[61, 73, 485, 106]]<|/det|>
## North Pier Field Note
<|ref|>text<|/ref|><|det|>[[60, 116, 504, 137]]<|/det|>
Record NP-024 | Revision B | 24 September 2026
<|ref|>sub_title<|/ref|><|det|>[[61, 180, 161, 200]]<|/det|>
## PURPOSE
<|ref|>text<|/ref|><|det|>[[60, 208, 295, 249]]<|/det|>
Three solar beacons need a routine condition check.
<|ref|>sub_title<|/ref|><|det|>[[61, 277, 134, 296]]<|/det|>
## SCOPE
<|ref|>text<|/ref|><|det|>[[60, 304, 240, 345]]<|/det|>
Only the east ramp is included in this note.
<|ref|>sub_title<|/ref|><|det|>[[521, 180, 620, 200]]<|/det|>
## DECISION
<|ref|>text<|/ref|><|det|>[[520, 207, 752, 228]]<|/det|>
Inspect before replacement.
<|ref|>sub_title<|/ref|><|det|>[[521, 276, 621, 296]]<|/det|>
## HANDFO
<|ref|>text<|/ref|><|det|>[[520, 304, 702, 345]]<|/det|>
Send the report to the maintenance desk.
<|ref|>sub_title<|/ref|><|det|>[[61, 420, 283, 443]]<|/det|>
## Materials estimate
<|ref|>table<|/ref|><|det|>[[63, 456, 933, 623]]<|/det|>
<table><tr><td>Item</td><td>Qty</td><td>Unit cost</td><td>Total</td></tr><tr><td>Beacon cap</td><td>3</td><td>\(12.00</td><td>\)36.00</td></tr><tr><td>Seal kit</td><td>2</td><td>\(7.50</td><td>\)15.00</td></tr><tr><td>Grand total</td><td></td><td></td><td>$51.00</td></tr></table>
<|ref|>sub_title<|/ref|><|det|>[[61, 704, 176, 723]]<|/det|>
## EXCEPTION
<|ref|>text<|/ref|><|det|>[[61, 732, 346, 752]]<|/det|>
The west ramp is outside this note.
<|ref|>text<|/ref|><|det|>[[60, 816, 270, 833]]<|/det|>
Verification code: LARCH-42
<|ref|>text<|/ref|><|det|>[[59, 844, 506, 862]]<|/det|>
All names and amounts on this page are invented for an OCR test.
